TR

|

ENG

BJK Vodafone Arena Stadium

The Vodafone Arena designed by DB Architects is completed at 2015 that consist of sport and entertainment center. The project of Arena is the biggest value project signed by Beşiktaş JK and Vodafone Turkey during the Turkish Sports history.

BJK Vodafone Arena Stadium is equipped with ultra-high definition screens, interactive screens, wide range Wi-Fi connections.

The seat capacity of the stadium is 41.903 and all type of seats (spectator seats, companion, lodge, protocol, VIP, press lodge, substitute player, 1903 tribune) produced with state of art technology.

FLY-102, MOD-205, MOD-401, MOD-501 products used on The BJK Vodafone Arena Stadium.

Trabzon Medi̇cal Park Arena Stadium

Trabzon Medical Park Arena Stadium is a TOKI project which was completed in 2016 and located in Trabzon city center.

Trabzon Medical Park Arena Stadium has reached to 41,461 capacity by using our FLY-101 and FLY-102 products

New Eskişehir Atatürk Stadium

The Eskişehir New Atatürk Stadium is a TOKI project, which was completed in 2016 and located in the city center of Eskişehir.

Eskisehir Stadium has 32,717 units of FLY-101 audience chair and 100 units of FLY-102 / Z disabled-companion chair, both of them are our high technology products.

Antalya Stadium

The Antalya Stadium construction project has completed by TOKI at city center on 2015. The seat capacity of the stadium is 33.000 and all type of seats (companion, lodge, protocol, VIP, press lodge, substitute player) produced with state of art technology.

MOD-104, MOD-105, MOD-205, MOD-402 products used on The Antalya Stadium.

Polisan Sports Hall

The project located in Gebze-Dilovası has finished in 2017. 

The products used in this sports hall are FLY 102 and FLY 102-Z.

Samsun Olympic Swimming Pool

The Olympic Swimming Pool project construction is done under authority of Ministry of Sports at 2015.

The seat capacity of the swimming pool is 973 and all type of seats (spectator seats, lodge, protocol, VIP, press lodge) produced with state of art technology.

FLY-101, MOD-105, MOD-205 products used on The Samsun Olympic Swimming Pool.

Manisa Indoor Sports Hall

The Olympic Swimming Pool project construction is done under authority of Ministry of Sports at 2015.

The seat capacity of the swimming pool is 3.500 and all type of seats (spectator seats, lodge, protocol, VIP, press lodge with tables) produced with state of art technology.

FLY-101, FLY-102, MOD-101, MOD-502 products used on The Manisa Indoor Sports Hall.